Vac Unit Addition
Problem: With crude feed slates becoming heavier over time, the client’s capabilities of recovering diesel and atmospheric gas oil became limited with the existing Atmospheric Crude Distillation Towers. As a result they were not able to recover a small portion of diesel and large portion of Atmospheric Gas Oil from the Atmospheric Tower Bottoms (ATB). Thus, these products were downgraded to No. 6 Oil.
Solution: Polaris proposed the design a of Vacuum Distillation Tower that would not only recover the Diesel cut and Atmospheric Gas Oil, but also increase Gas Oil yields further to meet Low Sulfur Vacuum Gas Oil product specifications.
Primary Teams: Polaris Engineering, Polaris Fabrication, Polaris Construction