| Refinery Refurbishment |
| Problem: |
A small Gulf Coast refinery had been dormant for over 4 years. The infrastructure, as well as the main processing units, had fallen into disrepair. The new ownership desired to run a different feedstock as well as different product slate than ever had been produced from the refinery. |
| Solution: |
Polaris Engineering provided designs for refurbishing the refinery as well as modifying the processing equipment to produce the new product slate. Polaris Construction provided fabrication, field services, and general contracting to perform the complete refurbishment of the plant. In seven months, the plant went from being dormant to producing on-spec products per the design. |
| Primary Teams: |
Polaris Engineering, Polaris Fabrication, Polaris Construction |