| Refinery Emergency Design |
| Problem: |
A large Midwest refinery suffered a severe fire in the single crude unit that would render the crude unit out of service for nine months. The refinery called in Polaris Engineering to figure out how to run the plant without the crude unit. |
| Solution: |
Polaris Engineering evaluated the plant and provided a design to utilize existing equipment within the plant in completely new services to process crude. The design was completed in less than one week and passed through HAZOP and Corporate review without any modifications. The revamp cost $10MM and allowed the plant to operate at the designed reduced throughput for 6 months while the crude unit was repaired. |
| Primary Teams: |
Polaris Engineering |